View as PDF

View report

Expo Home Inspections

expohomeinspection@gmail.com
(708) 288-0732
15941 Harlem Ave Suite 297 
Tinley Park IL 60477-1609
Inspector: John Espinosa
License No 450000604

Summary

Client(s):  Tiara Beecham
Property address:  6615 S Paulina St
Chicago IL 60636-3015
Inspection date:  Tuesday, December 22, 2020

This report published on Thursday, December 24, 2020 3:05:15 PM CST

This report is the exclusive property of this inspection company and the client(s) listed in the report title. Use of this report by any unauthorized persons is prohibited.

Concerns are shown and sorted according to these types:
Concern typeSafetyPoses a risk of injury or death
Concern typeMajor DefectCorrection likely involves a significant expense
Concern typeRepair/ReplaceRecommend repairing or replacing
Concern typeRepair/MaintainRecommend repair and/or maintenance
Concern typeMinor DefectCorrection likely involves only a minor expense
Concern typeMaintainRecommend ongoing maintenance
Concern typeEvaluateRecommend evaluation by a specialist
Concern typeMonitorRecommend monitoring in the future
Concern typeServiceableItem or component is in serviceable condition
Concern typeCommentFor your information


General information
1) This property has one or more fuel burning appliances, and no carbon monoxide alarms are visible. This is a safety hazard. Recommend installing one or more carbon monoxide alarms as necessary and as per the manufacturer's instructions. For more information, visit http://www.cpsc.gov/CPSCPUB/PREREL/prhtml05/05017.html
2) Structures built prior to 1979 may contain lead-based paint and/or asbestos in various building materials such as insulation, siding, and/or floor and ceiling tiles. Both lead and asbestos are known health hazards. Evaluating for the presence of lead and/or asbestos is not included in this inspection. The client(s) should consult with specialists as necessary, such as industrial hygienists, professional labs and/or abatement contractors for this type of evaluation. For information on lead, asbestos and other hazardous materials in homes, visit these websites:

Exterior
3) One or more trip hazards were found in sidewalk and/or patio sections due to cracks, settlement and/or heaving. A qualified contractor should evaluate and repair or replace sidewalk and/or patio sections as necessary to eliminate trip hazards.
4) Perimeter pavement slopes towards structure in one or more areas. This can result in water accumulating around the structure's foundation, or in basements and crawl spaces if they exist. Accumulated water is a conducive condition to wood destroying insects and organisms. Recommend having a qualified contractor make repairs as necessary so perimeter pavement slopes down and away from the structure.
5) Sidewalks and/or patios have significant cracks and/or deterioration in one or more areas. A qualified contractor should evaluate and repair or replace sidewalk and/or patio sections as necessary.
6) Siding is damaged and/or deteriorated in one or more areas. A qualified contractor should evaluate and make repairs and/or replace siding as necessary to prevent water and vermin intrusion.
7) Moderate cracks and/or deterioration found in one or more sections of brick veneer. A qualified contractor should evaluate and make repairs as necessary, such as repointing mortar, replacing bricks and/or sections of veneer.
8) One or more downspouts have no extensions, or have extensions that are ineffective. This can result in water accumulating around the structure's foundation, or in basements and crawl spaces if they exist. Accumulated water is a conducive condition to wood destroying insects and organisms, and may also cause the foundation to settle and possibly fail over time. Repairs should be made as necessary, such as installing or repositioning splash blocks, downspout extensions or installing and/or repairing tie-ins to underground drain lines, so rain water is carried at least several feet away from the structure to soil that slopes down and away from the structure.
9) One or more moderate cracks (1/8 inch to 3/4 inch) were found in the foundation. These may be a structural concern, or an indication that settlement is ongoing. The client(s) should consider hiring qualified contractors and/or engineers as necessary for further evaluation. Such contractors may include:
  • Foundation repair contractors who may prescribe repairs, and will give cost estimates for prescribed repairs
  • Masonry contractors who repair and/or replace brick veneer
  • Geotechnical engineers who attempt to determine if settlement is ongoing, and what the cause of the settlement is
  • Structural engineers who determine if repairs are necessary, and prescribe those repairs

  • At a minimum, recommend sealing cracks to prevent water infiltration. Numerous products exist to seal such cracks including:
  • Hydraulic cement. Requires chiseling a channel in the crack to apply. See http://www.quickrete.com/catalog/HydraulicWater-StopCement.html for an example.
  • Resilient caulks (easy to apply). See http://www.quickrete.com/catalog/GrayConcreteRepair.html for an example.
  • Epoxy sealants (both a waterproof and structural repair). See http://www.mountaingrout.com/ for examples of these products.
10) The exterior finish in some areas is failing. A qualified contractor should prep (pressure wash, scrape, sand, prime caulk, etc.) and repaint or restain areas as needed and as per standard building practices.

Roof
13) One or more sections of flashing at the base of the chimney are deteriorated and/or substandard. Leaks may occur as a result. A qualified roofing contractor should evaluate and repair as necessary.
14) One or more composition shingles are damaged, deteriorated and/or missing, and should be replaced. Leaks may occur as a result. A qualified roofing contractor should evaluate and make repairs as necessary.
15) Due to aging/condition of roof covering and flashing, we recommend a roofing certification by a qualified roofing contractor.
16) Debris has accumulated in one or more gutters. This is a conducive condition for wood destroying insects since gutters may overflow and cause water to come in contact with the structure's exterior or make water accumulate around the foundation. Gutters should be cleaned now and as necessary in the future.

Heating and cooling
21) The last service date of this system appears to be more than one year ago, or the inspector was unable to determine the last service date. The client(s) should ask the property owner(s) when it was last serviced. If unable to determine the last service date, or if this system was serviced more than one year ago, a qualified heating and cooling contractor should inspect, clean, and service this system, and make repairs if necessary. For safety reasons, and because this system is fueled by gas or oil, this servicing should be performed annually in the future. For more information visit: http://www.cpsc.gov/CPSCPUB/PREREL/prhtml05/05017.html
22) The estimated useful life for most forced air furnaces is 15 to 20 years. This furnace appears to be approaching this age and may need replacing at any time. Recommend budgeting for a replacement in the near future.
23) The air handler's filter(s) are loose or not securely installed. As a result, unfiltered air will flow through the system. The heating/cooling equipment service life and the indoor air quality may be reduced. A qualified contractor should make repairs as necessary, such as repairing or installing guides or retaining devices so filter(s) are securely installed with minimal gaps at edges.
24) Air handler filter(s) should be checked monthly in the future and replaced or washed as necessary.

Heating and cooling 2
26) The last service date of this system appears to be more than one year ago, or the inspector was unable to determine the last service date. The client(s) should ask the property owner(s) when it was last serviced. If unable to determine the last service date, or if this system was serviced more than one year ago, a qualified heating and cooling contractor should inspect, clean, and service this system, and make repairs if necessary. For safety reasons, and because this system is fueled by gas or oil, this servicing should be performed annually in the future. For more information visit: http://www.cpsc.gov/CPSCPUB/PREREL/prhtml05/05017.html
27) Air handler filter(s) should be checked monthly in the future and replaced or washed as necessary.

Plumbing and laundry
28) The water service pipe appears to be made of lead, which is a known health hazard, especially to children. Lead service pipes should be replaced to eliminate this hazard. A qualified plumber should evaluate and replace the service pipe and fittings as necessary to eliminate the lead hazard.
29) Some, most, or all of the water supply pipes in this structure are made of galvanized steel. Based on the age of this structure, these pipes may be nearing or may have exceeded their estimated useful life of 40 to 60 years. Internal corrosion and rust can reduce the inside diameter of these pipes over time, resulting in reduced flow and eventually, leaks. The inspector performed a "functional flow test" during the inspection where multiple fixtures were run simultaneously, and found the flow to be adequate. For example, the shower flow didn't decrease substantially when the toilet was flushed. Despite this, and because of their apparent age, these pipes may need replacing at any time.

Fireplaces, woodstoves and chimneys
32) No metal liner is installed in the masonry chimney, and one or more gas appliances use the chimney for a flue. Standard building practices require that a metal liner be installed in masonry chimneys used to vent gas appliances such as furnaces and water heaters. The purpose of the metal liner is to ensure a correct draft, and to prevent damage to the masonry flue from corrosive exhaust deposits and moisture in the exhaust gases. A qualified chimney service contractor should evaluate and install a metal liner as necessary. For more information visit http://www.csia.org/homeowners/gasapp.html and http://www.csia.org/homeowners/liners.htm
33) The masonry chimney's mortar is deteriorated and should be repaired to prevent further, significant deterioration. Recommend having a qualified chimney service contractor or mason evaluate chimney and repair as necessary. This will likely require repointing the mortar.

Basement
34) One or more sections of wiring that weren't terminated were found. This is a potential safety hazard due to the risk of shock. A qualified electrician should evaluate and repair as necessary. For example, cutting the wire to length and terminating the wire with wire nuts in a securely anchored, covered, properly sized junction box.
35) Wire splices are exposed due to not being contained in a covered junction box or loose fixtures. This is a safety hazard due to the risk of shock and fire. A qualified electrician should evaluate and make repairs as necessary. For example, install securely mounted fixtures, junction boxes with cover plates where needed to contain wiring splices.
36) One or more flights of stairs with more than two risers have no handrail installed. This is a safety hazard. A qualified contractor should install graspable handrails that your hand can completely encircle at stairs where missing, and as per standard building practices.
37) Cover plate(s) are missing from one or more electric boxes, such as for receptacles, switches and/or junction boxes. They are intended to contain fire and prevent electric shock from exposed wires. This is a safety hazard due to the risk of fire and shock. Cover plates should be installed where missing.
38) Evidence of prior water intrusion was found in one or more sections of the basement. For example, water stains and/or efflorescence on the foundation or floor, water stains at bases of support posts, etc. Accumulated water is a conducive condition for wood destroying insects and organisms and should not be present in the basement. The client(s) should review any disclosure statements available and ask the property owner(s) about past accumulation of water in the basement. The basement should be monitored in the future for accumulated water, especially after heavy and/or prolonged periods of rain. If water is found to accumulate, a qualified contractor who specializes in drainage issues should evaluate and repair as necessary. Typical repairs for preventing water from accumulating in the basement include:
  • Repairing, installing or improving rain run-off systems (gutters, downspouts and extensions or drain lines)
  • Improving perimeter grading
  • Repairing, installing or improving underground footing and/or curtain drains

Ideally, water should not enter the basement, but if water must be controlled after it enters the basement, then typical repairs include installing sump pump(s) or interior perimeter drains. Have a qualified contractor further evaluate and repair/maintain the foundation/basement walls.

Kitchen
40) One or more handles are missing from water shut-off valves. Handles should be replaced where missing.

Bathrooms
42) One or more sink drains use flexible drain pipe. This type of drain pipe is more likely to clog than smooth wall pipe. Recommend having a qualified plumber replace this pipe with standard plumbing components (smooth wall pipe) to prevent clogged drains.

Interior rooms
44) Guardrails are loose and/or wobbly in one or more areas. This is a safety hazard. A qualified contractor should evaluate and make repairs as necessary, such as installing new fasteners or hardware, installing additional fasteners and/or installing additional railing components as necessary so they are securely attached.
45) No smoke alarms are visible. This is a safety hazard. A qualified electrician should install smoke alarms as per standard building practices (functioning one exists in hallways leading to bedrooms, and in each bedroom, etc.). For more information, visit http://www.cpsc.gov/cpscpub/pubs/5077.html
46) Lamp holders or light fixtures with fully or partially exposed bulbs are installed in one or more closets. This is a safety hazard due to the risk of fire. Flammable stored items may come into contact with hot bulbs, and hot fragments from broken bulbs may fall on combustible materials. Standard building practices require closet lighting to use fluorescent light fixtures, or to use fully enclosed incandescent fixtures. Installing a compact fluorescent lamp in a lamp holder is not an acceptable practice. A qualified electrician should replace closet lights as necessary and as per standard building practices.
47) One or more flights of stairs with more than two risers have no handrail installed. This is a safety hazard. A qualified contractor should install graspable handrails that your hand can completely encircle at stairs where missing, and as per standard building practices.
48) Cover plate(s) are missing from one or more electric boxes, such as for receptacles, switches and/or junction boxes. They are intended to contain fire and prevent electric shock from exposed wires. This is a safety hazard due to the risk of fire and shock. Cover plates should be installed where missing.
49) Seals between double-pane glass in one or more windows appear to have failed based on condensation or stains between the panes of glass. A qualified contractor should evaluate and replace glass where necessary.

The client(s) should be aware that evidence of broken seals may be more or less visible from one day to the next depending on the temperature, humidity, sunlight, etc. Windows or glass doors other than those that the inspector identified may also have failed seals and need glass replaced too.
50) Screen(s) in one or more windows are missing. The client(s) should ask the property owner(s) about this. Screens are often removed for window cleaning and they may be stored somewhere. If not, then recommend installing screens where missing.
51) One or more doors bind in their jamb and cannot be closed and latched, or are difficult to open and close. A qualified contractor should evaluate and repair as necessary. For example, adjusting jambs or trimming doors.
52) Screen(s) in one or more windows are torn or have holes in them. Screens should be replaced where necessary.
53) Minor cracks/holes were found in walls in one or more areas. They do not appear to be a structural concern, but the client(s) may wish to repair these for aesthetic reasons.